Complex of services for participation in HPP construction, including supply of hydro technical, crane and electrotechnical equipment

In 1993, SFTC Ukrinterenergo signed the contract with Electricity of Vietnam for participation in the construction on the Sesan River of Yali HPP installed capacity 720 (4?180 MW). The contract, the cost of which amounted to USD 38.5 million, involved: design works and field supervision of HPP projects construction, design and supply of equipment, contract supervision of the equipment supplied. Works under the contract completed in 2001.

From 1995 till 1998, the company supplied high-efficient hydrotechnical equipment manufactured by OJSC Ukrhydromekh and OJSC Turboatom, crane equipment manufactured by JSC Novokramatorsk Machine-Building Plant and CJSC Zaporizhia Plant of Heavy Cranes, power transformers of OJSC Zaporizhtransformator and other equipment of Ukrainian manufacturers, to the Yali HPP.

The design of HPP projects fulfilled by OJSC Ukrhydroproject, design of hydrotechnical equipment – OJSC SPKTB Zaporizhhydrostal.